1. Craftsman Bungalow: Project Introduction
Aired 1 September 1997
A vintage Sears kit house is restored, but historic and sentimental elements are preserved.
2. Craftsman Bungalow: Wiring, Plumbing and Plastering
Aired 8 September 1997
A closet is transformed into a bathroom, while new and old building materials are blended in the living and dining rooms.
3. Craftsman Bungalow: Reconditioning the Windows
Aired 15 September 1997
Bob Vila oversees the reconditioning of an original window in the Sears kit house. Also: a tour of Frank Lloyd Wright's Hollyhock House.
4. Craftsman Bungalow: Interior Trim and Porch Framing
Aired 22 September 1997
Interior trim details are custom-milled as per the architect's specifications, and original bathroom fixtures are re-porcelainized. Also: framing continues on the back porch.
5. Craftsman Bungalow: Repairing the Front Facade
Aired 29 September 1997
Vintage cabinetry is discovered in a salvage yard and installed in the kitchen; yellow paint is stripped off; and the facade is given a facelift.
6. Craftsman Bungalow: Swimming Pool and Porch
Aired 6 October 1997
The pool crew finishes the rebar and sprays gunnite, while French doors are installed in the master bedroom and the porch roof is repaired.
7. Craftsman Bungalow: Working On the Pool
Aired 13 October 1997
Green Indian slate is installed on the surround and porch steps. Also: the backyard entry gate is finished.
8. Craftsman Bungalow: Exterior Paint Preparation
Aired 20 October 1997
At the Sears kit house, the exterior is stripped for priming and painting. Also: a tour of the CBS studio center.
9. Craftsman Bungalow: Floor Tile and Cabinet Installation
Aired 27 October 1997
The bathroom is tiled, new kitchen cabinets are custom-made to match the vintage ones, and decking is installed on the back porch.
10. Craftsman Bungalow: Installing Custom Light Grids
Aired 3 November 1997
The electrician installs back lighting in the living room, and six stained-glass panels are cut and assembled. Meanwhile, contractors insulate the roof.
11. Craftsman Bungalow: Installing Cabinets
Aired 10 November 1997
A cabinetmaker frames boxes for living-room built-ins to match existing ones in the kitchen, and the pool crew finishes the plaster.
12. Craftsman Bungalow: Hardwood Floor Repair and Refinishing
Aired 17 November 1997
Damaged hardwood flooring is repaired and an alder kitchen countertop is installed. Also: a tour of the Japanese Garden at Huntington Library and tips on building a Zen garden.
13. Craftsman Bungalow: House Tour
Aired 24 November 1997
Bob Vila leads a final tour of the landscaped front yard and the porch addition, which features a barbecue. Also toured are the Zen garden and swimming pool.
14. Dream Garage: Project Introduction
Aired 1 December 1997
Plans for a post-and-beam garage and boat storage project are discussed with an architect. Also: touring a marina with America's Cup champ Bill Koch.
15. Dream Garage: Working On the Foundation
Aired 8 December 1997
Foundation work is begun, while Bob Vila tours an antique car museum in a Shaker-style round barn in Sandwich, MA.
16. Dream Garage: More Foundation Work
Aired 15 December 1997
As the foundation is prepared, Bob Vila explains termite-proofing and oversees the installation of a hydronic heating system.
17. Dream Garage: Framing the Garage
Aired 22 December 1997
A look at framing, and the special techniques and tools that are used for it. Also: a tour of a lumber company examines pre-cut materials for the post-and-beam plan.
18. Dream Garage: Framing and Decking
Aired 29 December 1997
New decking is installed in the loft, while Bob Vila and the crew put up the ridge beam and rafters. Also: a joinery specialist demonstrates house framing.
19. Dream Garage: Insulating the Garage
Aired 5 January 1998
Insulation panels are installed and Bob Vila visits a factory where all-in-one wall product is made.
20. Dream Garage: Exterior Trim and Siding
Aired 12 January 1998
Windows, exterior trim and siding are installed. Also: a tour of the American Plywood Association lab, where quality testing is observed.
21. Dream Garage: Skylights and Metal Roofing
Aired 19 January 1998
Metal roofing is installed and drywall is put up around the skylights.
22. Dream Garage: Installing Protective Features
Aired 26 January 1998
Bob Vila takes a look at such safety features as motion detectors, a fire-suppression unit and a lightning rod.
23. Dream Garage: Installing a Staircase and Paneling
Aired 2 February 1998
A horticulturalist shares general landscaping tips and offers special advice on the use of native plants and trees. Also: building a staircase to the loft.
24. Dream Garage: Heating and Lighting
Aired 9 February 1998
A garage-door opener is installed, the heated-floor system is activated, and interior paneling is stained. Also: track lighting goes in.
25. Dream Garage: Setting up the Workshop and Garage
Aired 16 February 1998
The interior of the barn is stained and a workshop is assembled. Also: race-car driver Lyn St. James helps Bob Vila set up the automotive garage with new tools.
26. Dream Garage: Barn Tour
Aired 23 February 1998
Workbenches are completed and metal shelves are installed in the loft, before Bob Vila leads a tour of the finished barn.